Making a landmark out of a training facility.
Ours was the winning design in a PPP competition. We arranged the accommodation, training areas and other functions over three distinct wings and joined them with a lateral circulation route.
We created a slipway and jetty for a diver tank and helicopter ‘dunker’ pool.
Advanced thermal modelling helped us maximise airflows through the building with a thermally heavy structure and extensive exposed surfaces.
We devised a dramatic entrance with a linear waterway and boardwalk that leads into a large glazed atrium.