#{Title}
#{Copy}
Location | Client | Completion |
---|---|---|
Guangzhou, China | GETDD (Committee of Guangzhou Economic & Technological Development District) | 2007 |
Concept of a ground hugging 5000 capacity centre court with a spectacular four-bladed roof forming the centerpiece; 2000 capacity No 1 court and 1,500 capacity No 2 court plus seven other competition courts.
Makes careful use of levels on hilly site, allowing the visitor to enter at the base of the site and meander up to the tennis complex.
Tightly planned around a central podium building and club cabable of hosting a major ATP Tour.
Practice courts and other facilities occupy the other two thirds of the site.
masterplanning, architecture, civil & structural engineering (with Shenzhen Design Institute)